Draft for Public Hearing: Invitation to Contractors, Form of Contract, Bond and Contractor's Proposal for Construction of a Part of Proposed Rapid Transit Railroad, Portions of River Avenue Elevated Route and Jerome Ave. Elevated Route (route 16) ...M.B. Brown, 1910 - Broj stranica: 269 |
Sadržaj
1 | |
11 | |
12 | |
15 | |
29 | |
30 | |
35 | |
50 | |
227 | |
229 | |
231 | |
232 | |
234 | |
235 | |
237 | |
239 | |
52 | |
170 | |
172 | |
179 | |
182 | |
184 | |
189 | |
191 | |
193 | |
200 | |
204 | |
213 | |
215 | |
220 | |
223 | |
226 | |
242 | |
243 | |
245 | |
247 | |
250 | |
251 | |
253 | |
254 | |
255 | |
256 | |
258 | |
259 | |
261 | |
267 | |
269 | |
Uobičajeni izrazi i fraze
Amount approved appurtenances avenue Bensonhurst Bidder brick masonry Bronx River built cast cast-iron pipe cast-iron sewer pipe City Classification clean cluding Commission complete concrete masonry conduits Coney Island connections construction contract drawings Contractor crete cubic yd damage diameter drain pipe ducts duly Engineer may direct Estimated Unit Item foot of single form of contract furnished heads and covers inches thick including the disposal iron pipe joints laid lineal foot lineal ft locking device manhole heads mastic mate Quantities material ment mortar necessary one-half paid painted and erected payment Pelham Bay Park piles pitch place in stations plans Portland cement Price proposal Rapid Transit removed Route sand Schedule SECTION specifications square yd sub-surface structures subway sum of dollars sum of lineal Sureties terra cotta thereof thereto thousand pounds timber tion tractor trench vault lights viaduct steel vided vitrified pipe sewer waterproofing wrought iron York
Popularni odlomci
Stranica 208 - ... shall not be less than the prevailing rate for a day's work in the same trade or occupation in the locality...
Stranica 2 - An act to provide for rapid transit railways in cities of over one million inhabitants...
Stranica 89 - A third pat is exposed in any convenient way in an atmosphere of steam, above boiling water, in a loosely closed vessel for five hours.
Stranica 45 - Chairman, all facilities, whether necessary or convenient, for inspecting the materials to be furnished and the work to be done under this contract.
Stranica 207 - ... no laborer workman or mechanic in the employ of the contractor, sub-contractor or other person doing or contracting to do the whole or a part of the work...
Stranica 205 - ... shall be relieved and discharged from any and all liability and obligations growing out of said contract to such contractor, and to the person, company, or corporation to whom he shall assign, transfer, convey, sublet or otherwise dispose of the same, and...
Stranica 46 - The inspection of the work shall not relieve the contractor of any of his obligations to perform sound...
Stranica 59 - State which are now applicable to and control or limit in any way the actions of those engaged in the work or affecting the materials belonging to them, shall be respected and strictly complied with, and the Contractor shall further strictly comply with all applicable Federal, State and Municipal regulations regarding the transportation in and around the City and Harbor, of materials used in, or in connection with the work.
Stranica 200 - ... if at any time the Engineer shall be of the opinion and shall so certify in writing to the...
Stranica 207 - ... permitted or required to work more than eight hours in any one calendar day except in cases of extraordinary emergency caused by fire, flood or danger to life or property.