Department of Defense Appropriations for Fiscal Year 1980: Hearings Before a Subcommittee of the Committee on Appropriations, United States Senate, Ninety-sixth Congress, First Session

Naslovnica
 

Ostala izdanja - Prikaži sve

Uobičajeni izrazi i fraze

Popularni odlomci

Stranica 1013 - TRIDENT program will provide an undersea strategic missile system to ensure that this country continues to maintain a credible, survivable deterrent which is independent of foreseeable threats into the 1980's and beyond. The portion of the strategic ballistic missile force at sea is the least vulnerable element of our nation's mix of strategic forces.
Stranica 651 - Louisiana. He graduated from the University of Notre Dame with a BS Degree in 1961 and a MS Degree in 1963, both were In Electrical Engineering. He received a Ph.D. Degree in Electrical Engineering from Johns Hopkins University in 1967, and then attended the University of Michigan for one year of Poet-Doctoral study in communications.
Stranica 432 - Mr. Chairman and Members of the Committee, I am Vice Admiral CR Bryan, Commander, Naval Sea Systems Command. It is a pleasure to appear before you today to discuss shipbuilding and shipyards. If it meets with your approval, Mr. Chairman, I will use some information charts to assist me in the presentation and following these, I will of course be pleased to expand on the presentation material or address as many questions as you may desire.
Stranica 1023 - BUDGET ACTIVITY IV OTHER WEAPONS This budget activity provides for the procurement, modification and support of gun mounts. This activity contains such programs as the MK 15 PHALANX Close-in Weapon System and the MK 75 76MM Gun Mount. Funds for modifications to existing 5"/54...
Stranica 639 - RAP is a high explosive round with a rocket motor attached to the projectile base. This rocket assist extends range capability, yet the ease of operation common to conventional artillery munitions is maintained. Our request includes $28.2 million for Proj, 155mm, HE, ADATM/RAAMS (Artillery Delivered Antitank Munition/Remote Antiarmor Mine System).
Stranica 890 - These spares support the modification program. Replenishment spares are items procured to support all Naval Aviation programs subsequent to the end of the initial support period, known as the demand development period, which extends from the date of Preliminary Operational Capability (POC) to a point In time, not to exceed 18 months, when requirements are forecasted entirely upon actual demands. There are two elements of replenishment spares: basic replenishment and follow-on replenishment. Basic...
Stranica 134 - ... quick annihilation of key targets and reinforcements, NATO can blunt a Pact offensive thrust. Our strike aircraft must be able to survive enemy air defenses and destroy targets at a fast rate. b. Major Program Highlights (1) Low Altitude Airfield Attack System (LAAAS) We have initiated a joint US /UK engineering development for the JP-233 LAAAS. The system is designed for delivery by the UK Tornado and the US F-111E. Full-scale development started in November 1977. Detailed specifications have...
Stranica 103 - Mk-500 on the TRIDENT I missile necessary. C. DEFENSIVE SYSTEMS The basic elements of strategic defense consist of the surveillance and warning systems to detect and characterize hostile actions by strategic aircraft, missiles, or spacecraft, and the defensive weapons to counter these forces. Since the burden for deterrence is placed on our strategic offensive forces, only limited resources are being applied to developing defensive weapon systems. Nevertheless, we maintain a meaningful level of activity...
Stranica 147 - C-141 Stretch Modification The objective of this program is to increase this aircraft's ability to move oversize cargo by up to 30 percent and to decrease reliance on foreign bases. This is being accomplished by lengthening the C-141 fuselage by 23.3 feet and by installing an aerial refueling system. These capability increases are accomplished with no increase in peacetime operating costs. The first modified C-141 will be delivered to the Air Force in early FY 1980. By the end of FY 1980, 50 modified...
Stranica 437 - ... public shipyards at this time. The recommendation as made resulted from determinations that the private shipyards had the capacity to accommodate current projected Navy and commercial shipwork. Also, the resumption of new construction shipwork in naval shipyards would require significant manpower increases if degradation of fleet maintenance capabilities is to be avoided.

Bibliografski podaci