...public enemy; acts of the Government in either its sovereign or contractual capacity; fires; floods; epidemics; quarantine restrictions; strikes; freight...causes beyond the control of both the Contractor and sub§ 7-16.952 contractor, and without the fault or negligence of either of them, the Contractor shall... | |
| 1970 - Broj stranica: 196
...enemy; acts of the Government In either Its §23-7.154 sovereign or contractual capacity: fires; floods; epidemics; quarantine restrictions; strikes; freight...such failure arises out of causes beyond the control cl both the Contractor and subcontractor, and without the fault or negligence of either of them, the... | |
| 1972 - Broj stranica: 684
...public enemy, acts of the Government In either Its soverlgn or contractual capacity, fires, floods, epidemics, quarantine restrictions, strikes, freight...of a subcontractor to perform or make progress, and II such failure arises out of causes beyond the control of both the Contractor and subcontractor, and... | |
| 2006 - Broj stranica: 434
...public enemy, acts of the Government in either its sovereign or contractual capacity, fires, floods, epidemics, quarantine restrictions, strikes, freight...caused by the failure of a subcontractor to perform, and if such failure arises out of causes beyond the control of both the Contractor and subcontractor,... | |
| 1977 - Broj stranica: 944
...acts of the Government in either its sovereign or contractual capacity, fires, floods, epidémica, quarantine restrictions, strikes, freight embargoes,...Contractor. If the failure to perform is caused by the default of a subcontractor, and If such default arises out of causes beyond the control of both the... | |
| 1972 - Broj stranica: 914
...public enemy; acts of the Government In either Its sovereign or contractual capacity; fires; floods; epidemics; quarantine restrictions; strikes; freight...negligence of the Contractor. If the failure to perform IB caused by the failure of a subcontractor to perform or make progress, and If such failure arises... | |
| 1972 - Broj stranica: 914
...public enemy: acts of the Government hi either Its sovereign or contractual capacity; fires; floods: epidemics; quarantine restrictions; strikes; freight...the fault or negligence of the Contractor. If the faiHire to perform is caused by the failure of a subcontractor to perform or make progress, and If... | |
| 1974 - Broj stranica: 1020
...public enemy, acts of the Government In either its sovereign or contractual capacity, fires, floods, epidemics, quarantine restrictions, strikes, freight...perform must be beyond the control and without the fault or negligence of the Contractor. И the failure to perform Is caused by the default of a subcontractor,... | |
| 1968 - Broj stranica: 1348
...public enemy, acts of the Government In either Its sovereign or contractual capacity, fires, floods, epidemics, quarantine restrictions, strikes, freight...perform must be beyond the control and without the fault cr negligence of the Contractor. If the failure to perform Is caused by the default of a subcontractor,... | |
| 1965 - Broj stranica: 1168
...quarantlnt restrictions, strikes, freight embargoes, and unusually severe weather; but In every cast the failure to perform must be beyond the control...negligence of the Contractor. If the failure to perform l» caused by the default of a subcontractor, and If such default arises out of causes beyond the control... | |
| |